Measures For Preparation; Unpacking; Transporting; Storage - Samson 4763 Mounting And Operating Instructions

Table of Contents

Advertisement

4 Measures for preparation

After receiving the shipment, proceed as fol-
lows:
1. Check the scope of delivery. Compare
the shipment received with the delivery
note.
2. Check the shipment for transportation
damage. Report any transportation
damage.

4.1 Unpacking

NOTICE
!
Risk of positioner damage due to foreign
particles entering it.
Do not remove the packaging and protective
film/protective caps until immediately before
mounting and start-up.
1. Remove the packaging from the position-
er.
2. Dispose of the packaging in accordance
with the valid regulations.

4.2 Transporting

− Protect the positioner against external in-
fluences (e.g. impact).
− Protect the positioner against moisture
and dirt.
− Observe transport temperature depend-
ing on the permissible ambient tempera-
ture (see technical data in section 3.2).
EB 8359-2 EN
Measures for preparation

4.3 Storage

NOTICE
!
Risk of positioner damage due to improper
storage.
− Observe the storage instructions.
− Avoid long storage times.
− Contact SAMSON in case of different
storage conditions or long storage periods.
Storage instructions
− Protect the positioner against external
influences (e.g. impact, shocks,
vibration).
− Do not damage the corrosion protection
(coating).
− Protect the positioner against moisture
and dirt. In damp spaces, prevent con-
densation. If necessary, use a drying
agent or heating.
− Observe storage temperature depending
on the permissible ambient temperature
(see technical data in section 3.2).
− Store positioner with closed cover.
− Seal the pneumatic connections.
21

Advertisement

Table of Contents
loading

Table of Contents