Measures For Preparation; Unpacking; Transporting; Storage - Samson 3730-3 Mounting And Operating Instructions

Electropneumatic positioner with hart communication
Table of Contents

Advertisement

4 Measures for preparation

After receiving the shipment, proceed as fol-
lows:
1. Check the scope of delivery. Compare
the shipment received with the delivery
note.
2. Check the shipment for transportation
damage. Report any transportation dam-
age.

4.1 Unpacking

NOTICE
!
Risk of positioner damage due to foreign
particles entering it.
Do not remove the packaging and protective
film/protective caps until immediately before
mounting and start-up.
1. Remove the packaging from the position-
er.
2. Dispose of the packaging in accordance
with the valid regulations.

4.2 Transporting

− Protect the positioner against external in-
fluences (e.g. impact).
− Protect the positioner against moisture
and dirt.
− Observe transport temperature depend-
ing on the permissible ambient tempera-
ture (see technical data in section 3.7).
EB 8384-3 EN
Measures for preparation

4.3 Storage

NOTICE
!
Risk of positioner damage due to improper
storage.
− Observe the storage instructions.
− Contact SAMSON in case of different stor-
age conditions or long storage periods.
Storage instructions
− Protect the positioner against external in-
fluences (e.g. impact, shocks, vibration).
− Do not damage the corrosion protection
(coating).
− Protect the positioner against moisture
and dirt. In damp spaces, prevent con-
densation. If necessary, use a drying
agent or heating.
− Observe storage temperature depending
on the permissible ambient temperature
(see technical data in section 3.7).
− Store positioner with closed cover.
− Seal the pneumatic and electrical con-
nections.
39

Advertisement

Table of Contents
loading

Table of Contents