Configuring In Step 7; Requirements; Configuration With Step 7 And S7-Pct - Siemens SIRIUS 3RA6 System Manual

Compact starter
Hide thumbs Also See for SIRIUS 3RA6:
Table of Contents

Advertisement

6.3.2

Configuring in STEP 7

6.3.2.1

Requirements

Procedure when configuring IO-Link master and IO-Link Device
Configuration takes place in two steps with STEP 7, V5.4 SP5 or higher:
1. In
electronics module or 4SI IO-Link (both require at least firmware version 1.0.1).
2. You configure the connected compact starter (IO-Link Device) with the Port Configurator
Tool
Requirements
● STEP 7 V5.4 SP5 or higher
● The Port-Configurator-Tool
You can either install
download it from the Internet
(http://support.automation.siemens.com/WW/view/de/33102519/133100).
● The associated IO-Link IODD file (IO Device Description) is installed in
can download the IODD files for the SIRIUS devices from the Internet
(http://support.automation.siemens.com/WW/view/de/29801139/133100).
● Optional: The GSD files are installed in HW Config. You can download the GSD files for
the ET200S from the Internet (http://www.siemens.de/comdec).
● Optional: Install the function block FB "IOL_CALL" for backing up/restoring IO-Link master
parameters and IO-Link device parameters.
You can obtain the function block on the Internet
(http://support.automation.siemens.com/WW/view/de/33102519/133100).
You can find further information on the function block in "Module replacement
(Page 102)".
6.3.2.2

Configuration with STEP 7 and S7-PCT

Configuring the IO-Link master in
1. Start the SIMATIC Manager and configure the project as described in the
help.
2. In the hardware catalog of
ET 200eco distributed IO system).
3. Drag-and-drop the IO-Link master from the hardware catalog to the configuration table.
4. Parameterize the IO-Link master.
SIRIUS 3RA6 compact starter
System Manual, 09/2014, NEB560060102000/RS-AA/006
HW Config
, configure the IO-Link master (with GSD if necessary), e.g. the 4SI SIRIUS
S7-PCT (V2.0 or higher)
S7-PCT
HW Config
3RA64/3RA65 compact starter with IO-Link
.
S7-PCT (V2.0 or higher
together with STEP 7 V5.4 SP5 or higher, or you can
HW Config
, select the IO-Link master (e.g. in the ET 200S or
6.3 Configuring
is installed on the PG/PC.
S7-PCT
STEP 7
. You
online
99

Advertisement

Table of Contents
loading

Table of Contents