Keysight Technologies N9020B Installation Note page 43

Mxa signal analyzer
Table of Contents

Advertisement

2. Refer to
Figure
32. Dress the coaxial cables and semi-rigid cables neatly and tie together using
cable ties (1400-0249) at the locations indicated.
Figure 32
Adding Cable Ties near A9 and A10 Assemblies
3. Refer to
Figure
33. Reinstall the wire cable hold down. Assure the cables lie flat.
4. Dress the coaxial cables and semi-rigid cables neatly and tie together using cable ties
(1400-0249) at the locations indicated.
Figure 33
Cables Under Cable Hold Down
Installation Note N9020-90289
Installation Procedure
43

Advertisement

Table of Contents
loading

Table of Contents