Installation; Receiving The Boiler; Boiler Connections; Flow Connection - Thermal Solutions Arctic 1000 Installation & Operation Manual

Condensing boiler
Hide thumbs Also See for Arctic 1000:
Table of Contents

Advertisement

Arctic Installation and Operation Manual
P/N 105641-01
Dim
Description
Clearance
A
Above Top of
Boiler
Front of Boiler
B
– Burner End
From Chimney
or Vent
C
Collector
H
measured
horizontally
From Chimney
or Vent
C
Collector
V
measured
vertically
Rear of Boiler -
D
opposite burner
end
Left Side - tube
access side on
E
L
standard
construction
Right Side –
tube access side
on standard
E
R
construction
(ARC3500-
6000)
ARC1500 -3000
E
C
only

Table 2: Clearances and Serviceability

3

Installation

3.1

Receiving The Boiler

The boiler is shipped from the factory with
(4) shipping feet/legs bolted to the skids.
These are provided to facilitate unloading
/moving with a forklift. Lifting points are
also provided to enable over-head lifting with
spreader bars to prevent damage to the boiler.
The shipping feet/legs MUST BE
REMOVED after the boiler is set in-place on
its concrete foundation before any
piping/electrical connections are made. It is
11
Thermal Solutions, 1175 Manheim Pike, Lancaster, PA 17601 Web:
Phone: 717-239-7642 Fax: 877-501-5212 Email:
1500-
3500-
1000
3000
6000
6"
6"
6"
24"
32"
43"
18"
18"
18"
18"
18"
18"
6"
6"
6"
16"
23"
23"
6"
6"
23"
N/A
23"
N/A
recommended that the plastic protective
cover be left on as long as possible to reduce
finish damage from the installation.
3.2

Boiler Connections

Do not run any pipes along the tube access
panel side of the boiler. Maintain clearances
as shown on the dimensional drawing for
servicing of the boiler tubes. All piping
should be designed and installed to avoid any
loadings on the boiler connections or piping.

3.2.1 Flow Connection

The system supply and return flow
connections are shown on Figure 1. A gate
valve should be installed on the boiler outlet
and inlet lines. This allows the boiler to be
isolated from the heating system for draining
and servicing.

3.2.2 Safety Relief Valves

Safety relief valve(s) are shipped loose.
Connections are provided in the top of the
boiler for the safety relief valve(s). The safety
relief valve discharge piping must be the same
size as the safety relief valve discharge
opening and run to a point of safe discharge.
No shutoff valves are to be placed between
the relief valve and the appliance or in the
discharge piping. Avoid over-tightening as
this can distort valve seats. All piping from
the safety relief valve(s) must be
independently supported with no weight
carried by the valve.
NOTICE
If the relief valve discharges periodically,
this may be due to thermal expansion in a
closed water supply system. Contact the
water supplier or local plumbing inspector
on how to correct this situation. DO NOT
PLUG THIS RELIEF VALVE.
www.thermalsolutions.com
sales@thermalsolutions.com
Form: 2435-3
Revision: 10
Date: 12-1-2018

Advertisement

Table of Contents
loading

Table of Contents