Ignition Failure; Service, Maintenance, And Inspection; General Maintenance - Thermal Solutions Arctic 1000 Installation & Operation Manual

Condensing boiler
Hide thumbs Also See for Arctic 1000:
Table of Contents

Advertisement

Arctic Installation and Operation Manual
P/N 105641-01

4.10 Ignition Failure

After the first ignition failure, the boiler goes
into a hard lockout and a manual reset of the
Concert Boiler Control is required to restart
the boiler. The boiler will then attempt to
light off after it has completed its post-purge
process.
DANGER
Contact the boiler manufacturer or a
qualified heating service technician if the
boiler has failed to light consecutively
three times after initially resetting the
Concert boiler control.
5

Service, Maintenance, and Inspection

5.1

General Maintenance:

1. Follow any checks and/or inspections that
may be required as specified in the
component
manufacturers'
manuals.
2. Repair
or
replace
components immediately.
3. The following service procedures are
required for proper and safe boiler
operation.
DANGER
This boiler uses flammable gas, high
voltage electricity, moving parts, and very
hot water under high pressure. Assure that
all gas and electric power supplies are off
and that the water temperature is cool
before attempting any disassembly or
service.
More than one gas shut-off valve and
electrical disconnect switch are used on
the boiler. Assure that all gas valves and
electrical disconnect switches are off
before attempting any disassembly or
service.
35
Thermal Solutions, 1175 Manheim Pike, Lancaster, PA 17601 Web:
Phone: 717-239-7642 Fax: 877-501-5212 Email:
instruction
any
defective
Do not attempt any service work if gas is
present in the air in the vicinity of the
boiler. Never modify, removed or tamper
with any control device.
Do not use matches, candles, open flames
or other ignition source to check for leaks.
WARNING
This boiler must be serviced and repaired
by
skilled
and
technicians only.
If any controls are replaced, they must be
replaced with identical models supplied
by Thermal Solutions.
Read, understand and follow all the
instructions and warnings contained in all
the
sections
of
instructions and warnings contained in all
of the component instruction manuals.
If any electrical wires are disconnected
during service, clearly label the wire and
ensure that the wires are reconnected
properly.
Never jump out or bypass any safety or
operating control or components of this
boiler.
Assure that all safety and operating
controls and components are operating
properly before placing boiler back in
service.
www.thermalsolutions.com
sales@thermalsolutions.com
Form: 2435-3
Revision: 10
Date: 12-1-2018
experienced
service
this
manual.
The

Advertisement

Table of Contents
loading

Table of Contents