Thermal Solutions Arctic 1000 Installation & Operation Manual page 3

Condensing boiler
Hide thumbs Also See for Arctic 1000:
Table of Contents

Advertisement

Arctic Installation and Operation Manual
P/N 105641-01
3.5.3 Sound Pressure Levels................................................................................................................................................. 24
3.5.4 Pump and Piping Requirements .............................................................................................................................. 24
3.5.4.1
Water Flow Rates (Variable Primary Pumping Systems) .................................................. 24
3.5.4.2
Water Flow Rates (Primary / Secondary Systems) .............................................................. 25
3.5.4.3
3.5.4.4
Water Flow Rates for Glycol........................................................................................................... 26
3.6
Before Placing Boiler In Operation ............................................................................................................... 26
3.6.1 Pre-Boil Out Flushing Of System ............................................................................................................................. 26
3.6.2 Boil Out Procedure ........................................................................................................................................................ 27
3.6.3 Replacement Boiler Installations ............................................................................................................................ 27
3.7
Draining and refilling the boiler & system ................................................................................................ 28
3.7.1 Filling The System ......................................................................................................................................................... 28
3.7.2 Hydrostatic Test Of Boilers And System .............................................................................................................. 28
3.8
Boiler Water Treatment .................................................................................................................................... 28
3.8.1 Purpose of water treatment ...................................................................................................................................... 28
3.8.2 Objectives .......................................................................................................................................................................... 29
3.8.3 Water softener ................................................................................................................................................................ 29
3.8.4 Continuous Monitoring ............................................................................................................................................... 29
4
SYSTEM START-UP ....................................................................................................................................................... 30
4.1
through ARC3000 ................................................................................................................................................ 30
4.2
System Check: ........................................................................................................................................................ 31
4.3
Power the Boiler: ................................................................................................................................................. 31
4.4
Power the Circulators: ....................................................................................................................................... 31
4.5
Pressurize the Fuel System: ............................................................................................................................ 31
4.6
4.7
ARC3000 .................................................................................................................................................................. 33
4.8
Re-Starting After Prolonged Shutdown ...................................................................................................... 33
4.9
Testing of Controls and Safety Devices ....................................................................................................... 34
4.10 Ignition Failure ........................................................................................ Error! Bookmark not defined.
5
Service, Maintenance, and Inspection ................................................................................................................... 35
5.1
General Maintenance: ........................................................................................................................................ 35
5.1.1 DAILY: ................................................................................................................................................................................. 36
5.1.2 WEEKLY: ........................................................................................................................................................................... 36
5.1.3 MONTHLY: ........................................................................................................................................................................ 36
5.1.4 ANNUALLY: ...................................................................................................................................................................... 36
5.2
Ignition Assembly Cleaning ............................................................................................................................. 37
5.3
Burner Assembly Cleaning ............................................................................................................................... 37
5.4
Heat Exchanger Cleaning .................................................................................................................................. 37
5.5
Tube Replacement Procedure ........................................................................................................................ 38
5.6
Safety and Operating Controls ....................................................................................................................... 42
5.7
Troubleshooting ................................................................................................................................................... 43
Appendix A Sizing Gas Piping ........................................................................................................................................... 46
Appendix B Vent and Combustion Air Pressure Drop Data ................................................................................. 48
Appendix C Installation & Startup Report ................................................................................................................... 50
Appendix D Venting Diagrams ......................................................................................................................................... 51
Appendix D.1 Typical Horizontal Vent Piping ....................................................................................................... 51
Appendix D.2 Typical Vertical Pressurized Venting ........................................................................................... 52
iii
Phone: 717-239-7642 Fax: 877-501-5212 Email:
Form: 2435-3
Revision: 10
Date: 12-1-2018
www.thermalsolutions.com
sales@thermalsolutions.com

Advertisement

Table of Contents
loading

Table of Contents