Test And Inspections; Component Description; Table 1 Water Flow Switch Settings - Thermal Solutions Arctic 1000 Installation & Operation Manual

Condensing boiler
Hide thumbs Also See for Arctic 1000:
Table of Contents

Advertisement

Arctic Installation and Operation Manual
P/N 105641-01
1.3

Test and Inspections

Upon the completion of boiler installation,
final air-fuel adjustments are to be made by
factory
trained
service
emissions data and the O
and maximum input rate can be found on the
back side of the front-boiler's door, which can
be referenced in the future by the boiler
operator(s)
when
servicing the boiler. In addition, the following
tests and inspections are made on each boiler
at the factory to ensure it meets our highest
safety and functionality standards.
 ASME hydrostatic test inspection
 Electrical components inspection
 Operating & efficiency test
 Final engineering inspection
 Crating inspection
Danger
DO NOT store or use gasoline or other
flammable vapors or liquids in the vicinity
of this or any other appliance.
If you smell gas vapors, DO NOT try to
operate any appliance—DO NOT touch
any electrical switch or use any phone in
the building. Immediately, call the gas
supplier from a remotely located phone.
Follow the gas supplier's instructions or if
the supplier is unavailable, contact the fire
department.
1.4

Component Description

1.
Touchscreen display. (Used on ARC1000
– ARC3000) The display provides easy
access for viewing and adjusting boiler
operational parameters, monitoring
historical performance characteristics and
annunciating boiler alarm/lockout
conditions.
7
Thermal Solutions, 1175 Manheim Pike, Lancaster, PA 17601 Web:
Phone: 717-239-7642 Fax: 877-501-5212 Email:
personnel.
The
levels at minimum
2
troubleshooting
and
2.
Boiler On/Off switch. (Used on
ARC1000 – ARC3000)
3.
Manual gas shutoff valve. The boiler is
equipped with two manual gas shut off
valves, one located on the incoming gas
supply line outside of the boiler, and the
other downstream of the main gas valve.
4. Main gas supply connection.
5. Pressure relief valve. The pressure relief
protects the heat exchanger from an over-
pressure condition.
6. Ducted combustion air flange.
7. Flue gas vent outlet. The boiler comes
with a standard AL 29-4C® stainless steel
vent connection.
8. Boiler water flow switch. The boiler
water flow switch is adjustable within the
parameters listed in Table 1.
Settings
Switch
Closed
Minimum
Maximum

Table 1 Water Flow Switch Settings

9. Return water connection. A 3" diameter
Victaulic grooved connection is provided
on the ARC1000. A 3", 150# class, flange
is provided on the ARC1500 – 3000. A
6", 150# class, flange is provided on the
ARC3500-6000.
10. Cleanout and inspection. The ARC1000
has a 3" diameter Victaulic grooved
connection is provided for inspecting and
cleaning sediment from the heat
exchanger. The ARC1500-6000 has a 1"
npt pipe for blow down to clean sediment
from the heat exchanger and a 3"
removable plug for inspecting.
www.thermalsolutions.com
sales@thermalsolutions.com
Form: 2435-3
Revision: 10
Date: 12-1-2018
Mode Of Operation
Switch
Open
13
18
45
50

Advertisement

Table of Contents
loading

Table of Contents