Figure 2: Arc1500 - 3000 External Boiler Connections And Components - Thermal Solutions Arctic 1000 Installation & Operation Manual

Condensing boiler
Hide thumbs Also See for Arctic 1000:
Table of Contents

Advertisement

Arctic Installation and Operation Manual
P/N 105641-01
11. Supply water connection. A 3" diameter
Victaulic grooved connection is provided
on the ARC1000. A 3", 150# class, flange
is provide on the ARC1500 – 3000. A 6",
150# class, flange is provided on the
ARC3500-6000.
12. Air vent. The boiler is provided with an
internal dip tube that traps liberated air
from the boiler water. The air vent allows
the trapped air to escape from the boiler.
13. Boiler reset push button.
14. Boiler water temperature gauge.
15. Boiler water pressure gauge.
References 16 to 18 are only used on
ARC3500 – ARC6000
16. Boiler Hand/Off/Auto
17. Push Button Display. The display
provides easy access for viewing and
adjusting boiler operational parameters
and provides alarm/lockout codes.
18. Temperature Display. Provides for
temperature set points and actual
temperature.
8
Thermal Solutions, 1175 Manheim Pike, Lancaster, PA 17601 Web:
Phone: 717-239-7642 Fax: 877-501-5212 Email:
Figure 1: ARC1000 External Boiler
Connections and Components
Figure 2: ARC1500 - 3000 External Boiler
Connections and Components
www.thermalsolutions.com
sales@thermalsolutions.com
Form: 2435-3
Revision: 10
Date: 12-1-2018

Advertisement

Table of Contents
loading

Table of Contents