Huawei UPS5000-A-500 kVA User Manual page 55

Table of Contents

Advertisement

UPS5000-A-500 kVA
User Manual (e-shelter)
Figure 3-10 Expansion bolt composition
(1) M12 bolt
Knock the expansion bolt into the hole until the expansion sleeve completely fits into the
hole. The expansion sleeve must be completely buried under the ground to facilitate
subsequent installation.
Figure 3-11 Installing an expansion bolt (unit: mm)
1.
2.
3.
4.
Issue 02 (2020-01-10)
(2) Spring washer
Drill holes in the ground by using a hammer drill. The hole depth is 52 mm to 60 mm.
Partially tighten the expansion bolt and vertically insert it into the hole. Knock the
expansion bolt using a rubber mallet until the expansion sleeve is fully inserted into the
hole.
Partially tighten the expansion bolt.
Remove the bolt, spring washer, and flat washer.
Copyright © Huawei Technologies Co., Ltd.
(3) Flat washer
(4) Expansion sleeve
3 Installation
47

Advertisement

Table of Contents
loading

Table of Contents