Pioneer XY Series Installation Manual page 14

Hide thumbs Also See for XY Series:
Table of Contents

Advertisement

3 Rigging And Caster Setting
_________________________________________________________________________________________________________
Procedure (CP-XY1VC1)
Remove the eight pre-inserted mounting screws from the rateral of
(1)
enclosure. (Fig.3-2-2-A)
(2) Using the supplied six M10 socket head bolts (C), align the
mounting holes in the side plate (A)/(B) with the mounting points
on the rateral of the enclosure. Ensure that both the Flat
Washer (D) and the Spring Washer (E) are used - the Flat
Washer (D) should be in contact with the cradle. Tighten the
bolts over 15 N·m torque. (Fig.3-2-2-B)
The CP-XY1VC1 can be attached to the ceiling in one of the following two ways.
(A) When the yoke is attached to the speaker and then the speaker is mounted to the ceiling.
> Continue with the installation process from section (3a).
(B) When mounting the yoke to the ceiling and then mounting the speakers to the ceiling.
> Continue with the installation process from section (3b).
http://pioneerproaudio.com/
NOTE: XY-1 is shown in the illustrations below.
Fig.3-2-2-A
(B)
Fig.3-2-2-B
©2020 AlphaTheta CORPORATION
(D) (E)
(C)
(A)
Page 14 / 43

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xy-3bXy-1Xy-2Xy-2e

Table of Contents