6.5 Installation clearances

Warning
Exposed water piping and associated components (relief valves, circulators, etc.,
should not be in contact with combustible materials. Check local codes for required
clearances and / or provide adequate insulation.
Surface
Front
Left side
Right side
Top
Bottom
Table 3
Clearance distances for boiler mounting sites

6.6 Closet installations

For installations in a confined space (such as a closet), ventilation openings may be needed
through a door or wall to prevent excessive heat from building up inside the space.
The appliance must not be exposed to surrounding air above 122°F (50°C) or below 32°F (0°C).

6.7 Water Piping

IBC recommends using unions on the inlet and outlet water connections. Unions simplify many
service procedures, notably the cleaning of the inlet water strainer. See
19below for other piping recommendations.
EBX-Series
Minimum distance from combustible
surfaces
2"
2"
2"
2"
2"
22
Section: Installation
Recommended clearance
for installation and
service
24"
4" (allow access to water
connections)
4" (allow access to water
connections)
8" (to allow access to
elements)
6" (for drain and power
supply access)
Installation on page