Transaxle Shift Linkage Adjustment - Toro Reelmaster 335-D Service Manual

Table of Contents

Advertisement

Transaxle Shift Linkage Adjustment

1. Remove steering tower cover. Raise and securely
lock the front cutting unit in raised transport position.
2. Move axle shift lever forward to transport (high speed)
position. Measure shaft dimension from side of
transaxle case to end of shaft (Fig. 7). Adjust upper
linkage length at top eye rod if necessary to get proper
dimension (Fig. 8).
3. Move axle shift lever rearward to mow (low speed)
position. Measure shaft dimension from side of
transaxle case to end of shaft. Adjust linkage length at
top eye rod if necessary to get proper dimension.
4. Move axle shift lever forward to transport (high speed)
position and verify that the dimension is correct.
5. Move axle shift lever rearward to mow (low speed)
position. Start the engine and lower one cutting unit.
Turn on reel speed control and cutting unit engagement
switch. The cutting unit should engage. When axle shift
lever is moved to N or transport position, the cutting unit
should disengage. If the cutting unit does not disengage
there is a problem in the axle hi-low switch circuit (see
Chapter 5 - Electrical System).
®
Reelmaster
335-D
Measure from end of shaft to edge of transaxle.
1
1. Axle shift lever
Page 6 - 5
Low position
1.2 - 1.3 in. (30 - 33 mm)
HIgh position
2.6 - 2.7 in. (66 - 69 mm)
Transaxle
Figure 7
2
Figure 8
2. Upper linkage
Adjustments

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reelmaster 3500-d

Table of Contents