Section 10: Optional Equipment - Return To Landing Handrail - EZ-ACCESS PATHWAY HD Code Compliant Modular Access System Installation Supplement Manual

Steps
Hide thumbs Also See for PATHWAY HD Code Compliant Modular Access System:
Table of Contents

Advertisement

IN
OPTIONAL EQUIPMENT – RETURN TO LANDING HANDRAIL
10.
In addition to the return to ground at the bottom of the step, the step is also available with options to return
the handrail to a landing or to an existing surface at the top of the step. There are options to continue
(extend) the handrail parallel to the step or turn 90° before returning to the landing
10.1. Assemble the riser, guards, and handrails as described in this manual.
10.2. If installing the return to landing handrail ("return to landing") in line with the step handrail,
install the long leg of the 13-1/4" long 90° bend over the swaged end of the top transition bend
with the short leg oriented downward (FIG. 10.1).
FIG. 10.1
Installation Supplement for PATHWAY® HD Steps
or
existing surface.
Page 24 of 29

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PATHWAY HD Code Compliant Modular Access System and is the answer not in the manual?

Table of Contents