4.3 Preparations
4.3.1 Lifting the bushing
Overview
1
Lifting tool
30
Soft bedding, e.g. rubber mat or woodboard
31
Shackle
Procedure
1.
Make sure that the crane can lift the bushing. Refer to net weight in the packing list.
2.
Loosen the M8 bolts (24).
20
NOTE!
It is not necessary to remove the M8
bolts.
Installation and commissioning guide
2750 515-1 EN, REV. 14, 2020-06-26