4.7 Installation with draw rod at site

4.7.1 Preparations at site

Overview
This procedure is only applicable if the lower draw rod with the bottom contact (36) is installed in the
transformer.
Procedure
1.
Loosen the M8 bolts (24).
2.
Remove the M10 bolts (6), and then remove the
outer terminal (5).