Installation With Draw Lead - ABB GOE Series Installation And Commissioning Manual

Transformer bushing
Table of Contents

Advertisement

4.5.2 Installation with draw lead

Overview
2
Draw lead
12
Pull-through cord
32
Inner terminal
33
Bushing
Procedure
1.
1.
Remove the inner terminal (32) from the
bushing.
2.
Remove the nut (19) and washers.
Installation and commissioning guide
2750 515-1 EN, REV. 14, 2020-06-26
27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents