4.5.2 Installation with draw lead
Overview
2
Draw lead
12
Pull-through cord
32
Inner terminal
33
Bushing
Procedure
1.
1.
Remove the inner terminal (32) from the
bushing.
2.
Remove the nut (19) and washers.
Installation and commissioning guide
2750 515-1 EN, REV. 14, 2020-06-26
27