Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
ABB Manuals
Industrial Equipment
GOE Series
Installation and commissioning manual
Installation With Draw Rod At Transformer Factory; Removal Of The Lower Draw Rod With Bottom Contact From The Bushing - ABB GOE Series Installation And Commissioning Manual
Transformer bushing
Hide thumbs
1
2
Table Of Contents
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
page
of
88
Go
/
88
Contents
Table of Contents
Bookmarks
Table of Contents
Advertisement
4.6 Installation with draw rod at transformer factory
4.6.1 Removal of the lower draw rod with bottom contact from the bushing
Overview
The bottom contact is usually installed in the bushing when it is delivered from ABB, the first step at the
transformer factory is thus to remove it.
4
Lower draw rod
33
Bushing
35
Upper draw rod
36
Bottom contact
Procedure
1.
Install the shaft (37) of the hydraulic jack on the
draw rod (35), and put the box-spanner (13) on
the shaft (37) .
32
Installation and commissioning guide
2750 515-1 EN, REV. 14, 2020-06-26
Table of
Contents
Previous
Page
Next
Page
1
...
29
30
31
32
33
34
35
36
Show Quick Links
Quick Links:
Technical Specification
Recommended Maintenance
Hide quick links:
Permanently
Temporary
Cancel
Advertisement
Table of Contents
Related Manuals for ABB GOE Series
Industrial Equipment ABB GSA-OO Technical Manual
Transformer bushings (16 pages)
Industrial Equipment ABB GSB 245 Technical Manual
Transformer bushings (20 pages)
Industrial Equipment ABB GSBK Series Installation And Maintenance Manual
Transformer bushing (72 pages)
Industrial Equipment ABB GE ReliaGear Pro-Stock TEY Quick Start Manual
Lighting panelboards. three-phase circuit breaker kits (5 pages)
Industrial Equipment ABB GOE 2600 Installation And Commissioning Manual
Transformer bushing (84 pages)
Industrial Equipment ABB UniVer G12 Installation, Service And Maintenance Instructions
(16 pages)
Industrial Equipment ABB GPS4827 User Manual
Infinity power system (96 pages)
Industrial Equipment ABB Galaxy Power System Installation Manual
(147 pages)
Industrial Equipment ABB G390 Quick Start Manual
(13 pages)
Industrial Equipment ABB G391 Series Quick Start Manual
Edge ac short circuit current limiter (13 pages)
Industrial Equipment ABB ProKiln GAC400 Operating Instruction
Probe gas sampling system (132 pages)
Industrial Equipment ABB A130-M66 Operation Manual
(152 pages)
Industrial Equipment ABB ACS1000 User Manual
System drives (166 pages)
Industrial Equipment ABB Turbocharger A130-M Original Assembly Instructions
(24 pages)
Industrial Equipment ABB REO 517*2.4 Installation And Commissioning Manual
Multi-functional terminals for railway application (186 pages)
Industrial Equipment ABB ReliaGear ND Installation, Operation And Maintenance Manual
Ansi narrow design metal-clad switchgear (28 pages)
Related Content for ABB GOE Series
GOE 2600 Installation At The Transformer Factory
ABB GOE 2600
GSBK Series Installation With Draw Rod
ABB GSBK Series
GOE 2600 Removal Of The Bushing From The Transformer, Draw Rod
ABB GOE 2600
PCS6000 Figure 6-10 Grounding Cam At A Base Frame With M12 Bolt
ABB PCS6000
UniGear ZS1 Method Of Installation B - Fixing With Anchoring Bolts To Concrete Floor
ABB UniGear ZS1
ACS1000i Figure 3-8 Transformer And Rectifier Compartment With Combined Input Disconnector (A) And With Grounding Switch (B)
ABB ACS1000i
UZE Transformer Filled With Oil
ABB UZE
UBB Series Checking At Commissioning Of The Transformer
ABB UBB Series
VUBB Transportation With Transformer Oil In The Transformer
ABB VUBB
UBB Series Installation In The Transformer
ABB UBB Series
GSB 245 Draw Rod System
ABB GSB 245
VD4-HPA Installation
ABB VD4-HPA
HVC 200 Move The Packaged Cabinet With A Forklift Truck
ABB HVC 200
UniGear 500R Your Safety First - At All Times
ABB UniGear 500R
Enhanced MicroVersaTrip Plus Section 2. Before Installation
VD4 Installation
ABB VD4
This manual is also suitable for:
Goe 250
Goe 2550
Goe 380
Goe 650
Goe 950
Goe 1050
...
Show all
Goe 1175
Goe 1300
Goe 1425
Goe 1550
Goe 1675
Goe 1800
Goe 2550-1600
Goe 2550-1675
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL