Leak Test; Safety Procedures - probst SH-1000-MINI Operating Instructions Manual

Vacuum lifting device
Hide thumbs Also See for SH-1000-MINI:
Table of Contents

Advertisement

Available languages

Available languages

Maintenance and care
7.6

Leak test

Switch on the lifting device/engine.
Place the lifting device on a piece of sheet metal or a similar surface and apply suction.
Caution: Only apply suction to the sheet; do not lift it! It can loosen while being checked and fall off.
Switch the pump on and wait until a vacuum pressure of -0.6 bar is reached.
Switch off the engine and watch the pressure gauge. Suction should not decrease by more than 0.1 bar within 5
minutes. If it does, locate the cause for this error and correct it before operating the device.
7.7

Safety procedures

It is the contractor's responsibility to ensure that the device is checked by an expert in periods of
max. 1 year and all recognized errors are removed (→ see DGUV regulation 1-54 and DGUV norm
100-500).
The corresponding legal regulations and the regulations of the declaration of conformity must be
observed!
The expert inspection can also be done by the manufacturer Probst GmbH.
Contact us at:
service@probst-handling.com
We recommend affixing the inspection sticker "„Sachkundigenprüfung / Expert inspection" in a
clearly visible place (order no.: 2904.0056+Tüv sticker with year number) after the inspection has
been done.
The check by an expert must be proved!
Device
Year
5240.0018
Date
V4
Expert
33 / 34
Company
GB

Advertisement

Chapters

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SH-1000-MINI and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Sh-1000-mini-h

Table of Contents