Example number 3
In this example different exit angles have been set. Automower will easily reach all parts of the working
area. The risk of tracks forming is less with these settings compared with allowing the mower to follow the
boundary wire out of the charging station.
Increasing the delay time for the boundary wire increases the chance of the mower finding the charging
station before it starts to follow the boundary wire. When searching it is a disadvantage for the mower to
follow the boundary wire across an incline.
Fully approved
Follow loop
Boundary wire
Delay
20 minutes
Corridor width
6
56 - English
3. INSTALLATION
1
3m (10ft)
2
3m (10ft)
Guide wire
Exit angles
7 minutes
Start angle 1 – End angle 1 (3)
6
Start angle 2 – End angle 2 (1, 2)
Proportion first
3
3012-625
Area 1, 2, 3
60° and 200°
240° and 270°
40 %

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Automower Solar Hybrid and is the answer not in the manual?

Table of Contents

Save PDF