Part 4 Appendixes; Minutes About A Debug Solution Confirmation Meeting; Visual Inspection Checklist Of The Debug System - Gree Ultra Heat GMV Multi VRF Heat Pump Series Service Manual

Table of Contents

Advertisement

Ultra Heat GMV VRF Technical Service Manual
MAINTENANCE

PART 4 APPENDIXES

1 MINUTES ABOUT A DEBUG SOLUTION CONFIRMATION
MEETING
Confirming air conditioner debug solution to the *** project
Theme: ***
Time: ***
Place: ***
Participants: ***
Contents: ***
1
2
3

2 VISUAL INSPECTION CHECKLIST OF THE DEBUG SYSTEM

Visual inspection checklist of *** air conditioning equipment
Item
Problem
Checked by
Check time
Appearance of ODUs
Refrigerating system
Appearance of IDUs
Thermal insulation of copper pipes
Discharge system
Thermal insulation of condensing pipes
Power line diameter
Electric system
Cabling of power lines
Air circuit breaker
Materials of communication lines
Communication
system
Connection of communication lines