Ultra Heat GMV VRF Technical Service Manual
4 ASSEMBLING AND DISASSEMBLING KEY PARTS OF ODUS
Precondition: No refrigerant exists in the pipeline system and the power supply has been disconnected
Step
1. Remove the front panels.
Drive board
Compressor
Diagram
145
Operation Procedure
●Use a screwdriver to unscrew the upper and
lower front panels.
●Lift the front panels in order to take it out.
Note: Both the upper panel and lower panel are
fixed with two fasteners respectively to connect
to the side panels.
MAINTENANCE