Sign In
Upload
Manuals
Brands
Gree Manuals
Heat Pump
CN851W2260
Gree CN851W2260 Manuals
Manuals and User Guides for Gree CN851W2260. We have
1
Gree CN851W2260 manual available for free PDF download: Service Manual
Gree CN851W2260 Service Manual (240 pages)
Brand:
Gree
| Category:
Heat Pump
| Size: 16.14 MB
Table of Contents
Table of Contents
2
Preface
6
Chapter 1 Introduction to Basic Features of Units
12
Basic Operating Principle
12
Internal Piping Design of the Units
13
Piping Diagram of GMV-V72W/A-F(U) 、GMV-V96W/A-F(U)
13
Names and Main Functions of Components
13
Basic Parameters of Odu
15
Electrical Parameters
16
Power Cable Wire Gauge and Circuit Breaker Selection of ODU
16
Circuit Diagram of ODU
16
Optional Accessories
17
Basic Requirement for Pipe Connection
18
Precautions on Refrigerant Leakage
19
Unit Operating Temperature
21
Chapter 2 Installation
23
Part 1 Engineering Installation Preparation
23
Installation Safety
23
Importance of Installation Engineering
23
Cooperation between Different Professions
24
Requirements for Cooperation with Civil Engineering
24
Requirements for Cooperation with Decoration Engineering
25
Requirements for Cooperation with Electric
25
Onsite Review of Design Drawing
27
Construction Organization Process
28
Part 2 Material Selections
29
Requirement for Selecting Construction Materials
29
Requirement for Selecting Major Materials
29
Copper Pipe
29
Communication Cable and Control Cable
29
Power Cable
30
Other Requirements
30
Part 3 Installation Space Requirements
31
Place Selection for Installing Odu
31
Odu Dimensions and Installation Hole Size
31
Installation Space Requirement for Odu
31
Part 4 Requirements on Foundation Installation
38
Odu Foundation
38
Odu Fixing
39
Vibration Reductions for Odu
39
Part 5 Piping Connection
40
Schematic Diagram of Piping Connection
40
Schematic Diagram of Piping Sequence
40
Allowable Pipe Length and Drop Height Among Idu and Odu
40
Fitting Pipe between Odu and the First Manifold
42
Part 6 Pipe Installation and Insulation
45
Pipe Installation for the Cooling System
45
Precautions on Pipe Direction Design
45
Processing to Refrigerant Pipes
46
Installation of Refrigerant Pipes
47
Pipe Installations for the Condensate Water System
55
Pipes
55
Requirements on Installation
55
Other Requirements
56
Requirements on Installation of Drain Pipes for Different Types of Idus
57
Requirements on Independent Drainage for each IDU
58
Requirements on Centralized Drainage for Idus
58
Insulation System
58
Insulation for the Refrigerant Pipe System
58
Insulation for the Condensate Water Pipe System
59
Insulation for Air Ducts
59
Part 7 Electric and Controller Installation
61
Precaution
61
Installation of the Power Cable
62
Precautions
62
Requirements on Power Cable Configuration
62
Procedure for Installing the Power Cable
63
Installation of the Communication System
65
Connection of Communication Cable Terminals
66
Connection of Communication Cables
66
Communication Cable Connection Method and Procedure
66
Part 8 Vacuumization and Desiccation for the Refrigerant System
70
Air-Tightness Test
70
Importance of the Air-Tightness Test
70
Procedure for Performing the Air-Tightness Test
70
Precautions
70
Vacuumization and Desiccation for the System
71
Requirements on the Vacuum Pump
71
Procedure and Precautions for Vacuumization and Desiccation
71
Part 9 Refrigerant Perfusion
73
Calculation Method for Perfusing Refrigerant
73
Method for Perfusing Refrigerant
74
Refrigerant Pre-Perfusion
74
Refrigerant Perfusion During Running
75
Chapter 3 Commissioning Operation
78
Part 1 Security Requirements
78
Precautions for Construction
78
Precautions for the Use of Refrigerants
78
Function Settings of Odus
78
System Function DIP Switch Settings
79
System Function Button Operations
82
Function Setting Operations
84
Basic Operations for Engineering Commissioning
86
Part 2 Commissioning Process
88
Necessity of Vrf Engineering Commissioning
88
Required Files and Tools for Engineering Debugging
88
Required Tools for Engineering Commissioning
88
Commissioning Files
88
Engineering Commissioning Procedures
89
Pre-Commissioning Preparations
89
Pre-Commissioning Check
89
Commissioning Operation
93
Chapter 4 Maintenance
106
Part 1 Failure Code Table
106
System Failure Code Table
106
Odu Leds Table
109
Part 2 Exceptions and Troubleshooting
112
How to Locate a Faulty Idu Promptly
112
Exceptions Analyzing and Troubleshooting
113
Form Analyzing
113
Flowchart Analyzing
115
Part 3 Key Parts Maintenance
128
Cautions on Controller Replacement
128
Cautions on IDU AP1 Replacement
128
Cautions on Wired Control Replacement
130
Compressor Replacement and Cautions
131
Determining Compressor Fault
131
Compressor Replacement
135
Cautions on Compressor Drive Board and Pfc Board Replacement
145
Assembling and Disassembling Key Parts of Odus
150
Unit Maintenance
162
ODU Heat Exchanger
162
Discharge Pipe
162
Pre-Season Cautions
162
Post-Season Maintenance
162
Parts Replacement
162
Part 4 Appendixes
163
Minutes about a Debug Solution Confirmation Meeting
163
Visual Inspection Checklist of the Debug System
163
Debug Parameter Record List
164
Common Parameter Lists
165
R410A Refrigerant Pressure / Saturation Temperature List
165
Resistance / Temperature Lists of Temperature Sensors
166
Voltage / Pressure Lists of Pressure Sensors
172
Exploded Views and Spare Part List
176
Exploded View of GMV-V72W/A-F(U)、GMV-V96W/A-F(U)
176
Spare Part List of GMV-V72W/A-F(U)、GMV-V96W/A-F(U)
176
Chapter 5 Remote Control
181
Part 1 Engineering Debugger
181
Overview
181
System Networking
181
Composition of System Network
181
Hardware
182
List of Parts
182
USB Data Converter
182
COM Interface Board
184
Lines
184
Software Setup and Uninstall
184
Prerequisites
184
Installation Procedure
184
Software Startup and Shut down
188
Uninstall VRF Debugging Software
189
Using Debugger
191
Manual for Initial Usage
191
User Log in and Registration
192
Main Interface
193
Debugging Function
194
Data Function
203
Overview
205
Major Functions
205
Network Topology
205
Part 2 Vrf Monitoring System
205
Hardware
209
List of Parts
209
Gateway
209
Introduction of Optoelectronic Isolated Repeater
216
Software
218
List of Parts
218
Preliminary Check
218
Software Setup and Uninstallation
219
Software Initial Usage and Unit Connection
225
Vrf Monitoring System Debug
228
Air Conditioner System Debug
228
Communication Debug between Gateways and Air Conditioning Units
228
Communication Debug between Gateways and Electric Meters
229
Communication Debug between Gateways and Gree VRF Monitoring System
231
Troubleshooting
235
Hardware Faults
235
Software Faults
235
Advertisement
Advertisement
Related Products
Gree CN851W2250
Gree CF090W1530
Gree CF090W1820
Gree CC053044000
Gree CC053043900
Gree CF090W2280
Gree CF090W2300
Gree CF090W2290
Gree CF090W2310
Gree CF090W2270
Gree Categories
Air Conditioner
Heat Pump
Dehumidifier
Controller
Chiller
More Gree Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL