Wiring The Battery Box - Honeywell Gent Vigilon Installation Instructions Manual

Panel based fire detection and alarm system
Table of Contents

Advertisement

Wiring the battery box

Wiring the battery box
Wiring options
Cable distance
1.5mm² - 10m maximum
2.5mm² - 15m maximum
Control panel
Panel
P3
P2
B1-
B2-
TH+ TH-
B1+
B2+
Battery Box
To maintain earth continuity, an earth lead (not supplied), is required
to be fi tted to an earth point in the control panel with the other end to
an earth point in the battery box.
24
www.acornfiresecurity.com
Battery box
in a remote
location
Where the wiring is terminated
at the top of the panel ensure
the cables run neatly
down the side of the
enclosure to the terminals
P1
B1+
TH+
TH-
B2-
B1-
P6
P4
P1
TH1
www.acornfiresecurity.com
Here the battery box is
shown mounted beneath
the control panel
B2+
P3
P2
Control
panel
Battery
box

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents