1. Pressure hose
41. Raise the rear of the machine until 2 jack stands can
be positioned under the rear tube at a height that
supports the rear tires 2.5 to 7.5 cm (1 to 3 inches) off
the ground.
42. Lower the floor jack so the rear frame rests on the jack
stands. Position the floor jack under the center of the
front lift arm pivot tube.
43. Remove the flat washer (1/2 inch) and nut (1/2 inch)
installed on the stud on the bogie pivot
Figure 118
1. Washer and nut on the bogie pivot stud
44. Raise the floor jack until the front tires are off the
ground high enough to install the track beneath them
and support the frame with jack stands.
45. Remove the front and center tires from the winter
assembly
(Figure
119).
G009488
2. Tank hose
(Figure
118).
1. Front tire
46. Carefully lift the tracks over the rear wheel and front
hubs. The direction of the track rotation is printed on
the track. The V design in the rubber track must point
forward.
CAUTION
The track guides have many pinch points.
Coming into contact with one of these pinch
points could cause severe personal injury.
Carefully grasp the rubber track on the outer
edges outboard of the steel guides when
moving the track.
47. Adjust the floor jack to a suitable height to install the
front tire.
48. With a helper, lift the front of the track enough to
carefully install the front tires
49. Adjust the floor jack to a suitable height to install the
center tire. Lift the center of the track enough to install
the center tire.
Note: Torque the lug nuts to 88 to 115 N-m (65 to
85 ft-lb).
45
Figure 119
(Figure
120).
Figure 120

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3047430675

Table of Contents