Kessel Aqualift F Installation And Operating Manual page 79

Pumpstation for all wastewaters (with/without sewage), for underground/sub-surface installation
Table of Contents

Advertisement

Available languages

Available languages

Handover certificate (copy for the company carrying out the installation)
The initial operation and instruction was carried out in the presence of the person authorised to perform the
acceptance and the system operator.
The system operator/person authorised to perform the acceptance was informed about the obligation to ser-
vice the product according to the enclosed operating instructions.
Initial operation and instruction were not carried out.
The client/ person responsible for initial operation was handed the following components and/or product components
Initial operation and instruction is being carried out by (company, address, contact, phone)
The exact coordination of the dates for initial operation/instruction is being carried out by the system operator and per-
son responsible for initial operation.
Place, date
Signature of person
authorised to perform acceptance
Handover-Ceritficate
Signature of system operator
79
Signature of the company
carrying out the installation work

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Aqualift f duoTpf 1.3Tpf 1.92838028390

Table of Contents