Operating Procedures; Loading The Film; Top Mandrel; Film Threading - Pro Mach Orion SENTRY System Manual

Table of Contents

Advertisement

Orion
Revision 2.8
27 August 2014

Operating Procedures

Loading The Film

Figure 3 - 2

Top Mandrel

Figure 3 - 3

Film Threading

Figure 3 - 4
Film Threading
The film roll can be loaded on the carriage mandrel from either end of the roll. When
using tacky film, verify that the tacky surface of the film is inward on the load.
1. Remove the top mandrel spool.
2. Put the roll of film on the bottom mandrel.
3. Install the top mandrel on top of the roll to prevent upward movement.
4. Pull down the carriage open lever and pivot the carriage door open.
5. Pass the roped tail of the film through opening.
6. Thread the film around the spools, as shown.
Semi-Automatic Stretch Wrapping Machine
System Operation
Sentry by Orion
Page 3-3

Advertisement

Table of Contents
loading

Table of Contents