Table of Contents

Advertisement

Orion
Revision 2.8
12 May 2017

Inspection

Note:
Figure 1 - 5
Panel Access Key
1. Remove all packing and supporting additions - these may include the blocks under the
carriage and the restraining bar over the table.
When removing the stretchwrap film covering the machine, care
must be taken not to cut any of the electrical wires and/ or polyure-
thane covering on the film carriage rollers.
2. Perform a visual inspection of the electrical and mechanical parts for loosened joints
and / or broken connections. Any suspected shipping damage must be reported imme-
diately to the freight carrier. Any transport damage cannot be claimed to Orion Pack-
aging Inc.
Items that are vulnerable to damage and must be inspected are as follows:
Motors and transmissions
Junction boxes
Electrical conduits
Proximity and limit switches
Photocells
3. Check around the tower to ensure that there is no crippling of the movable parts i.e.
casters, center axle or drive assembly.
4. Verify the following:
Check wires and conduits for crushed sections or loose fittings.
Verify the film carriage to be sure that it is correctly aligned with the tower
Verify the tension on the lift belt.
Verify all the dials and knobs on the control panel for smooth action.
Use the panel access keys to open the panel or motor access doors. The Panel Access
Key part # is 735586.
Semi-Automatic Stretch Wrapping Machine
Introduction and Safety
Sentry by Orion
Page 1-11

Advertisement

Table of Contents
loading

Table of Contents