Otto Bock 2C7 Instructions For Use Manual page 17

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 13
16) Press the bulge
17) Press the proximal edge
adapter.
18) NOTICE! Do not damage the plug connection and cable.
Insert the plug
19) Install the cover cap
adapter
during this process. (see fig. 12).
20) Tighten the screws
21) Perform the charging process to verify that the plug connection is prop­
erly connected (see the instructions for use of the prosthetic foot).
22) Press the cover plate
5.2 Removing the footshell
Tools required:
>
Vice, 704G30 clamping tool, 2C101 footshell replacement tool, flat
screwdriver, T10 Torx screwdriver (see fig. 13 –
1) NOTICE! Proceed carefully during removal.
Do not damage the spacer lug
replacement tool (see fig. 2).
2) Insert a flat screwdriver
out of the cover cap
3) Unscrew the screws
4) Remove the cover cap
5) NOTICE! Do not damage the plug connection and cable. Do not
pull on the cable.
Pull the plug
(see fig. 5).
6) NOTICE! To protect the pyramid adapter, use the 704G30 clamping
tool.
Clamp the clamping tool
7) Mount the pyramid adapter of the prosthetic foot in the pyramid receiver
of the clamping tool.
8) Bring the prosthetic foot to maximum plantar flexion (see the instructions
for use of the prosthetic foot).
9) Pull the spacer lug
10) Pull the sole
11) Fold the spacer lug
of the footshell into the groove
of the footshell against the edge
into the receptacle
. Do not allow the footshell
(see fig. 13).
into the cover cap
into the groove
(see fig. 15).
(see fig. 4).
.
of the cable
into the vice
out of the adapter
out of the adapter
in the proximal direction (see fig. 7).
of the cover cap (see fig. 11).
(see fig. 14).
and cables
and push the cover plate
out of the receptacle
(see fig. 6).
of the footshell (see fig. 9).
of the footshell.
. (see fig. 10).
to slide off the
)
with the footshell
in the cover cap
of the
17

Advertisement

Table of Contents
loading

Table of Contents