Siemens SIJECT 16i Operation Manual page 50

Hide thumbs Also See for SIJECT 16i:
Table of Contents

Advertisement

SIJECT OP15B Screens
3-24
Injection end (InjEnd)
Holding end (HldEnd)
Charging end (ChaEnd)
Ejector advance end (EjeEnd)
Mold protection time (MProTm)
in second.
Mold lock time (MLckTm)
second.
Injection time (InjTm)
Cycle time (CycTm)
Charging time (ChaTm)
second.
End position of injection, in mm.
End position of pressure holding, in mm.
End position of charging, in mm.
End position of ejector advance, in mm.
Time of low-pressure mold protection,
Time of high-pressure mold lock operation, in
Total time of 4 stages injection, in second.
Time record of every machine cycle, in second.
Time record of every charging operation, in
SIJECT 16i Operation Manual

Advertisement

Table of Contents
loading

Table of Contents