Chapter 2 Install Your Product; Plug In Signals; Plug In Main Power; Turn On Your Product - RGBlink FLEX4ML User Manual

Table of Contents

Advertisement

Chapter 2 Install Your Product

2.1 Plug in Signals

Connect signals to the product (ensure all devices are powered off first). Tighten connector screws/locks
where provided.

2.2 Plug in Main Power

Connect IEC cable to device and plug into wall socket. Turn on power at wall socket.

2.3 Turn on Your Product

Turn the power switch on the rear to ON position.
TST screen shows as below, meanwhile the device enter initializing state after that, the device will show
its input and output and system state.
User Manual
FLEX4ML
10

Advertisement

Table of Contents
loading

Table of Contents