 Important
All digital and analog control cables must be shielded. Connect the cable
shields to the shield clamp on the unit as shown in the following figure.
Figure 5‑45. Shield clamp

dASM Commissioning

To ensure optimal functionality of the dASM grid load optimization, make sure to do
the following when commissioning:
• Check the power controller for in-phase grid connection
• Check wiring of patch cables
• Select operating mode TAKT (with the same TAKT cycle period) for all power
controller devices
• Verify these parameters on the master unit:
◦ dASM NO. OF DEVICES
◦ dASM POWER THRESHOLD [W]
• Start up each unit in the dASM group

dASM Notification

The dASM grid load optimization generates the following notifications in the master
unit in the event of an error:
• dASM device number is incorrect: Check patch cable connections/
parameter dASM device number
• dASM power limit has been exceeded: Reduce setpoints of the
assembly as appropriate
The notifications generated can be reported via:
• Fault log
• LED
• Relay
• Thyro‑Touch display
57010148-00G
Shield clamp
Cable
Exposed shield
Installation, Setup, and Operation
®
Thyro-PX
Power Controller
5‑50

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thyro-px 1pxThyro-px 2pxThyro-px 3px

Table of Contents