Delivery Inspection; Installation Data - Master Bilt MCR-33101 Installation & Operation Instructions

Blast chiller
Hide thumbs Also See for MCR-33101:
Table of Contents

Advertisement

In this step you inspect the equipment as delivered
NOTICE
Please read this section prior to installing your Blast Chiller Condensing Unit. This
information is based on good refrigeration practice and should be used as a guide for
installation and operation of your equipment.

DELIVERY INSPECTION

-Check for damages when the carrier delivers the equipment
1. Refer to Freight Claims, page 12
-Indicate damages on the carrier's Bill of Lading so a claim may be filed
NOTICE
To minimize damage to the unit housing, it is recommended that the crate not be removed
until the unit is moved to its final location.
* Follow the installation instructions included with the Condensing Unit.

INSTALLATION DATA

EQUIPMENT REQUIRED
-Pans and lids
1. Hold food during blast chill operation
2. Hold food for refrigerated storage
-Thermometer to check food temperature (0-200F)
STEP 12
26

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents