1. Turn on the main power switch.
2. Check the Initial Adjustment SP Lists and if it is necessary to run
an SP manually after replacing the part, execute the SP.
3. Output the SMC logging data with SP5-990-004 and check the
counter values.
4. Make sure that the PM counters for the replaced units are "0" in
the PM parts display.
Slide 146
No additional notes
Procedure
After Installing New PM Parts
Then, the machine will reset the PM counters automatically and
some initialization will also be done automatically.
Initial Adjustment SP Lists: This section of the manual is a list of
things that are done after a PM part is replaced. The Auto/Manual
column shows whether it is done automatically or must be done
manually with an SP.
»
The automatic items will only be done if you reset the PM counter
before you removed the old part. Then, after you turn the power on
again, the process is done automatically.
»
Initial adjustment for "Force Apply Lubricant Execute" is done
manually. This is because it is necessary separate the ITB cleaning
blade from the ITB before this can be done.
If the PM counter for a unit was not reset, then reset that counter
again.