Air-Cooled And Evaporative Condensers-Two-Piece Unit Fit - Trane IntelliPak 2 Series Installation, Operation And Maintenance Manual

Commercial rooftop air conditioners
Table of Contents

Advertisement

I I n n s s t t a a l l l l a a t t i i o o n n
Figure 34. Roof rail connection
Brackets
Figure 35. Roof panel splice plate connection
Apply splice plate to
bottom of roof panels
at unit split
54
Figure 36. Side panel and roofcap reinstallation
Reinstall roof cap
removed earlier
Air-Cooled and Evaporative Condensers
—Two-Piece Unit Fit Up
1. Rig the low side unit (Air handler) and the high side
unit (Condenser) separately.
2. First, rig and set the low side unit on the roof curb
(aligned with return end).
3. Take off and discard the protection boxes. (Do not
remove wire shields).
4. Remove the rail connector splice brackets and
install the brackets on the low side unit base rails.
5. Take off the side panels (these are labeled) and the
top cover of the high side unit and set aside to be
assembled later.
6. Rig and set the high side unit on roof curb pedestal,
using the rail splice bracket as an alignment aid to
connect the Low and high side units. The Low and
high side unit rails should be butted together with a
maximum 2" separation.
7. Remove the left upper and lower louvered panels
and the corner panels on each side to aid in tubing
and wiring connections.
Apply butyl tape on
unit split in roof
Reinstall side
panels removed
earlier
RT-SVX24Q-EN