2.
Set the sampling time, trigger, and other areas as required, then start measurement.
3.
The waveform is displayed on completion of measurement. The obtained data can be checked by clicking "Zoom",
"Cursor", and other buttons.
I/O monitor display
The I/O signals of the servo amplifier and the on/off status of the I/O device can be displayed. The input/output status of the
signals and wiring can be checked at device startup and throughout the project creation progress.
5 MONITORING
148
5.2 Checking with MR Configurator2