5. Tap Start MPO to begin the test. An error message will appear if NO fiber was selected.
When the strand test finishes, the outer circle changes to green (PASS) or red (FAIL),
depending on the Pass/Fail thresholds previously set, and moves to the next strand until all
selected strands are tested.
6. To view all MPO strands, select the Traces tab and then select all fibers under the MPO
group to overlay results for the ribbon. For more information about the Traces tab, see
Section 8.4
Traces.
OTDR Series e-Manual, RevE00
MPO tab