Download Print this page

Sub-Zero PRO 48 Series Installation Manual page 17

Hide thumbs Also See for PRO 48 Series:

Advertisement

PRO 48 Installation
Installation Checklist
To ensure a safe and proper installation, the following
checklist should be completed by the installer to ensure
that no part of the installation has been overlooked.
INSTALLATION CHECKLIST
Have all packing materials been removed?
Turn the unit on. Is it operating properly?
If not, is the unit plugged in? Is the control turned on?
Is the water supply line connected and not leaking? Is
the water supply turned on and ice maker control on?
Has the anti-tip bracket been installed securely and
properly engaging the unit?
Is the unit leveled properly on a solid, level floor? Has
the drain pan and kickplate been installed?
Has the top grille assembly been reinstalled?
Are doors and drawers aligned for proper appearance
and operation? Is a 90° door stop required?
Has the water filter cartridge been removed (for homes
with a reverse osmosis system)?
Does the customer understand the unit's operation?
Does the customer have the warranty package?
Have any installation or service problems been noted
on the product registration card? Has the registration
card been mailed in?
Have stainless steel surfaces been inspected for any
imperfections? This is to be done by the authorized
Sub-Zero dealer or installer with the customer, upon
completion of installation. Stainless steel surfaces are
covered by a limited 60-day warranty for cosmetic
defects.
17
subzero.com/specs

Advertisement

loading

This manual is also suitable for:

648pro648prog