Download Print this page

Sub-Zero PRO 48 Series Installation Manual page 11

Hide thumbs Also See for PRO 48 Series:

Advertisement

PRO 48 Installation
Position the Unit
Before moving the PRO 48 unit into position, secure
doors and drawers closed and protect any finished
flooring.
Use an appliance dolly to move the unit near the rough
opening. The PRO 48 is equipped with rollers, so it can be
moved into position more easily.
When securing the unit on the appliance dolly, use the
corner protectors (retained from the packing materials)
under the strapping to avoid damage to the stainless steel
exterior. Also, secure the doors and drawers closed with
the strapping. Refer to the illustration below for proper
placement of the appliance dolly.
IMPORTANT NOTE: The rear levelers must be in their
lowest position in order to roll the unit back into the rough
opening. Leveling cannot be completed until the unit is in
position.
Moving the PRO 48.
IMPORTANT NOTE: If for any reason the unit has been
laid on its back or side, you must allow the unit to stand
upright for a minimum of 24 hours before connecting
power.
Shut off power to the electrical outlet. Plug the power cord
into the grounded outlet and roll the unit into position.
Make sure the anti-tip bracket is properly engaged.
The PRO 48 is very heavy—885 lbs (401 kg) or 900 lbs
(408 kg). Be sure to have adequate manpower when
moving and positioning the unit.
11
subzero.com/specs

Advertisement

loading

This manual is also suitable for:

648pro648prog