2.19 Power Supply Specifications

Fullwood Ltd does not carry out any mains wiring. It is the responsibility of the
customer to arrange for all mains wiring to be carried out by a competent contractor
qualified in accordance with national and/or local legislation. This also applies to any
mains electrical connections from switches of isolators to electrical equipment
supplied by Fullwood Ltd.
The power requirements will vary significantly, depending on the ancillary equipment
specified.
Supply
1ph
3ph
Power consumption for all other pieces of equipment e.g.: Air Compressor, Vacuum
pump, Boiler Etc. will need to be calculated and specified per site.
Earthing; It is the responsibility of the customer to ensure that all metal parts of the
installation are bonded to earth in accordance with local and national legislation.
M²erlin must be earthed according to local legislation.
Starting up M²erlin without proper earthing will render the warranty null and void.

2.20 Ambient Temperature

Min
Max

2.21 Compressed Air Requirements

Number of M
Note: Contact Fullwood for installations of over six M²erlins
Note: Specifications above are the requirements of the machine not of the compressor.
Most rotary compressors are 100% duty cycle so calculations are required. Most piston
compressors are 50% duty cycle so the compressor output needs to be double the
requirement detailed above.

2.22 Air Drying

The dryer must be rated to operate efficiently at the lowest typical temperature for
the country/area.
294130
Operating Instructions for Safe Use
Fullwood M²erlin
Supply Voltage
Volts
216-253
376-440
2°C
45°C
2
erlins
CFM (m
1
2
3
4
5
6
Minimum supply pressure
Maximum supply pressure
Max Current
Power factor
cos f
Amps
25
>0.8
16
>0.8
3
/hr)
2 (3.4)
4 (6.8)
5 (8.5)
6 (10.2)
7 (11.9)
8 (13.6)
7 bar
11 bar
Earth Leakage
mA RCD
100
100
Stored Air
150L
150L
200L
200L
250L
250L
Page 15 of 81

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the M2erlin and is the answer not in the manual?

Related Products for Fullwood M2erlin

Table of Contents

Save PDF