Installation Instructions; Connecting The Solvent Reservoirs - Thermo Scientific Dionex AutoTrace 280 Operator's Manual

Spe instrument
Hide thumbs Also See for Dionex AutoTrace 280:
Table of Contents

Advertisement

Dionex AutoTrace 280 Operator's Manual
shipping container. Place the items in a convenient location and check them
against the packing list. If there are any discrepancies, immediately report
them to Thermo Fisher Scientific.
B.3 Installation Instructions
Installing the Dionex AutoTrace 280 involves the following steps:
Make solvent connections.
Install the waste drain and tubing.
Connect the exhaust hose and gas supply.
Check compression fittings for tightness.
Turn on the power.
Provide access to a computer.
Install the AutoTrace software.
NOTE For installation instructions for the sample reservoirs,
B.3.1

Connecting the Solvent Reservoirs

This section provides instructions for how to connect the solvent
reservoirs to the Dionex AutoTrace 280. The procedure varies slightly,
depending on the type of system.
For a standard Dionex AutoTrace 280, go to
For a Dionex AutoTrace 280 PFAS, go to
Connections to a Standard Dionex AutoTrace 280
To connect solvent tubing lines on the left side of the system to the
solvent reservoirs:
1. Position the reservoirs to the left of the standard Dionex AutoTrace
280, keeping the following considerations in mind:
128
see
page
53.
The reservoirs must be within reach of the tubing that extends
from the left side of the system.
page
128.
page
131.
Doc. 065330-05 03/2020

Advertisement

Table of Contents
loading

Table of Contents