8.2
Transport
Material losses
We recommend removing the cylinder casing for trans-
portation to the installation location to prevent it from
becoming dirty or damaged.
SBB 501 WP SOL
f Both side insulation sections can be removed for transporta-
tion in tight spaces. To do this, remove the cylinder casing.
f Use the fixing straps to refit the thermal insulation sections
after transportation.
1
1 Side thermal insulation section
f Ensure that the closures are in the joint between a side
thermal insulation section and the thermal insulation of the
cylinder.
Ä
Z
éÑ
qT ZH<
ê
|ùù| ê
1
9.
Preparing for installation
9.1
Removing / fitting the cylinder casing
Note
Open or remove the cylinder casing before fitting the DHW
circulation and indirect coil lines.
Fit the cylinder casing before fitting a flanged immersion
heater.
The plinth trim should be fitted after the tightness check.
9.2
Checking the signal anode
Material losses
The appliance must not be operated without a consump-
tion indicator or with a damaged one, otherwise water
will leak out once the anode is depleted.
9.3
Heating installation
f Flush the indirect coils with water before connecting the
heating water pipes.
SBB 401 WP SOL | SBB 501 WP SOL without solar installation
f You may connect both indirect coils to the "heat pump heat-
ing return" and "solar flow" (see chapter "Specification /
Dimensions and connections").
9.4
Fitting the water connection and the safety
assembly
Note
Carry out all water connection and installation work in
accordance with regulations.
f Flush the line thoroughly.
f Connect the DHW outlet and the cold water inlet lines with
the safety assembly. Bear in mind that, depending on the
static pressure, you may also need a pressure reducing valve.