4
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
1.
Network construction
Configure the system and set the parameters which are required for start-up.
• Wiring ( Page 26 WIRING)
• Parameter setting ( MELSEC iQ-R MELSECNET/H Network Module User's Manual (Application))
2.
Network diagnostics
Using MELSECNET diagnostics, check if the cables are connected properly and communication is performed normally with
the configured parameters.
For details, refer to the following.
 MELSEC iQ-R MELSECNET/H Network Module User's Manual (Application)
3.
Programming
Create a program. For details, refer to the following.
Page 29 COMMUNICATION EXAMPLES
4 PROCEDURES BEFORE OPERATION
22