Husqvarna PT26D Workshop Manual page 25

Hide thumbs Also See for PT26D:
Table of Contents

Advertisement

DELIVERY AND DEALER SERVICE
11.Check the muffler fastening bolts
Check that the muffler is fitted securely. Checking
and retightening the screws after running the
engine warm for the first time is recommended.
Temperature variations and vibrations can mean
that the tightening torque for the screws drops.
The screws should be checked when servicing to
guarantee the correct torque. The tightening toque
should be about 20 Nm.
WARNING!
The muffler gets very hot in use
and remains so for a short time
afterwards. Contact can result in
burns. Remember the risk of fire.
12.Checking for leakage
After test running, check that no leakage of cool-
ant, engine or hydraulic oil occurs.
13.Customer info on delivery
See "Delivery Procedures" on page 22.
14.Administration
Fill in the sales papers, customer register, etc.
Don't forget to fill in the serial number on page 5 in
the Operator's manual and to confirm that the
delivery service has been performed in the service
journal.
24
English-

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents