Husqvarna P 520D Workshop Manual page 18

Hide thumbs Also See for P 520D:
Table of Contents

Advertisement

Dismantling
1.
Jack up and block the machine under the frame
as illustrated.
IMPORTANT!
Make sure not to place the trestle so that the
connecting rod is damaged or parts of the
articulated unit are blocked.
2.
Place a vessel under the transmission to collect
oil spill.
3.
Clean according to the general instructions.
4.
The hydraulic hoses can be mixed up. Mark the
lines so that they are reconnected on the correct
connections.
5.
Loosen the hydraulic lines. Fit sealing plugs to
prevent leakage and contamination.
1
2
1.
Area allowed for supporting.
2.
Area forbidden for supporting.
IMPORTANT!
Suspend the connecting rod with a cable
tie around the drive shaft so that it is not
damaged when the rear carriage is loosened.
6. Loosen the front end of the connecting rod (1).
Remove the flanged nut (2), screw (3) and
washer (4).
1
1.
Connecting rod
2.
Flange nut
Chassis
3
2
4
3.
Screw
4.
Washer
17
English –

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

P 525d

Table of Contents