Prepare pressure testing

1. Make sure that the red hand lever
is in parallel position to the pipe
system.
2. Loosen the nuts.
3. Remove the hand lever.
4. Loosen the union nuts of the
protective housing and move them
aside.
5. Unscrew the union bush (left-
hand thread!) and move it aside.
6. The use of a pin wrench is
recommended (00 23 90).
7. Remove the stem from the
protective housing. A groove on
the stem allows the use of a
screw driver.