Figure 4-27 Installing battery baffle plates (7+7 scenario)
Step 4 Install battery communications cables.
1.
2.
Figure 4-28 Installing battery communications cables (8+8 scenario)
(1) Full-capacity cabinet configuration
Issue 03 (2020-08-07)
NO TE
Place the front covers properly to prevent the light pipes from falling off.
Install communications cables between battery modules.
Connect communications cables (reserved in the lower right corner of the
cabinet) between the battery modules and the battery management module.
Copyright © Huawei Technologies Co., Ltd.
(2) Half-capacity cabinet configuration