Initial Commissioning; Important; Switching On - F3-Design NIPPER Installation Instructions Manual

Table of Contents

Advertisement

Initial commissioning

Important

Before commissioning, observe the following:
-
The device must not be damaged.
-
All delivered documents are available.
-
The operator is familiar with the documents.

Switching ON

The switch is pressed briefly to turn it on. Then the device is automatically switched on. After the start time of 60
seconds, the vehicle is ready to use.
Note: By pressing the switch briefly, the device switches on automatically (<1 second), by pressing it for longer,
it switches off (>3 seconds).
INSTALLATION INSTRUCTIONS NIPPER - JULY 2020
Figure 4: Main switch
13

Advertisement

Table of Contents
loading

Table of Contents