Technical Data - Clearances; Fig. 9 - Unit Clearances - York YCAL Series Installation Operation & Maintenance

Air-cooled scroll chillers style d with ipu ii and i/o boards (50 hz) 29 ton to 65 ton
Hide thumbs Also See for YCAL Series:
Table of Contents

Advertisement

FORM 150.66-NM3
SECTION 6 - TECHNICAL DATA
ISSUE DATE: 09/25/2020

TECHNICAL DATA - CLEARANCES

(2 m)
(1.3 m)
LD10506
NOTES:
1. No obstructions allowed above the unit.
2. Only one adjacent wall may be higher than the unit.
3. Adjacent units should be 10 ft (3 m) apart.
FIG. 9 – UNIT CLEARANCES
92
JOHNSON CONTROLS

Advertisement

Table of Contents
loading

Table of Contents