Technical Data - Clearances; Fig. 15 - Unit Clearances - York YCAL0012EC Installation Operation & Maintenance

Air-cooled scroll chillers style d with ipu ii and i/o boards (60 hz) 9 1/2 ton to 28 ton
Hide thumbs Also See for YCAL0012EC:
Table of Contents

Advertisement

FORM 150.66-NM2
SECTION 6 - TEChNICAl DATA
ISSUE DATE: 09/25/2020

TECHNICAL DATA - CLEARANCES

(1.3 m)
(2 m)
lD10506
NOTES:
1. No obstructions allowed above the unit.
2. Only one adjacent wall may be higher than the unit.
3. Adjacent units should be 10 ft (3 m) apart.
FIG. 15 – UNIT CLEARANCES
90
JOHNSON CONTROLS